New Found Passenger Terminal Building (PTB) Will Be Up For Construction At Seletar Airport
-
- The new incoming terminal is set to be realized by end of 2018 and the structure for the new PTB is ready to start October this year after the bid for the construction was issued last May 18. A groundbreaking Passenger Terminal Building (PTB) will be up for construction at Seletar Airport, Civil Authority (CAAS) as proclaimed on May 19. This is to contain the gain in air traffic and maximize efficiency in aviation services. The plan is likewise part of attempts to ease pressure sensation on the invariably active Changi Airport. As soon as the new PTB is up and running, the present-day operations at passenger terminal on Seletar Airport western side will end. For more info on the Rising Projects, have a look https://www.propertyreview.sg/seletar-airport-new-passenger-terminal-building-to-be-ready-in-end-2018/.
-
- USD
-
(Use contact form below)
-